Green Energy

In addition to supplying individual components, Ollen Project can manufacture complete assemblies. For instance, we have supplied 2 Kaplan turbines to Bulgaria and recently 3 Francis turbines to Trentino Alto Adige Authorities.

Further, the turbine assemblies have been pre-assembled at our facilities so as to prevent that the machined components may cause assembly shortcomings at the construction site. Here, the equipment has been manufactured according to customer’s engineering designs, but it can also be designed by the design firms that cooperate with us.

Francis Turbine Impeller
 
Girante turbina Francis (3)
Girante turbina Francis (6)
Girante turbina Francis (7)
Girante turbina Francis (8)

Kaplan 18
 
Kaplan 18 (1)
Kaplan 18 (3)
Kaplan 18 (5)

Vanes
 
Palette (1)
Palette (2)
Palette (5)

Francis Turbine
 
Turbina Francis (2)
Turbina Francis (3)
Turbina Francis (4)
Turbina Francis (5)